Events from the Oil and Gas Industry

IADC WellCAP & API Workover / Well Completion

November 9, 2009 - November 13, 2009
Well Control School (WCS) - Houston
Suite 290 - 16770 Imperial Valley Drive -- 2nd Floor
Houston
Texas
USA


This course is based on the principles and theory of well control. Commonly used well control techniques with workover operations in mind are presented. The latest information and technologies available are used to instruct in maintaining control of the well during workover and completion operations. This program meets industry guidelines and certification is awarded upon successful completion at Introductory, Fundamental and Supervisory levels. Simulators are used to conduct hands-on training for personnel attending this course.

Course content: Live Well Intervention Well Control, Complications, BOP Equipment, Killing a Producing Well, Pressure Control, Regulations, Surface / Subsurface Equipment, Kick Warning Signs, Remedial Fluids, Constant Bottomhole Pressure Methods, Stripping, Snubbing, and Coiled Tubing.

Contact Information

Dr. David Tannich
President
Well Control School (WCS) - Office Headquarters
Suite 290 - 16770 Imperial Valley Drive -- 2nd Floor
Houston
Texas
Phone: +1 (713) 849-7400
Fax: +1 (713) 849-7474
http://www.wellcontrol.com

INFOOIL SECTIONS

InfoOil Careers InfoOil News InfoOil Events InfoOil Library